100% Original Factory Custom Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have probably the most state-of-the-art output equipment, experienced and qualified engineers and workers, recognized good quality manage systems plus a friendly skilled income workforce pre/after-sales support for Hasp And Lock, Emergency Stop Lockout, Oem Plug Lockout, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
100% Original Factory Custom Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue Detail:

Feature

A.Fitted to all legal access points, the unique holder and insert ensure that the latest scaffold status is instantly visible from the scaffold build stage to dismantle.

B.The holder displays “DO NOT USE SCAFFORD” prior to inspection,then it is used in conjunction with a choice of three inspection inserts: prohibition,standard inspection and load classification.

What is the specific process of scaffolding tags?

The first step: prepare in advance

Prepare to shut down energy in advance. Common energy types listed on scaffolding tags include electromagnetic energy, mechanical kinetic energy, air energy water heaters, etc… and its potential risks. Put the protective maintenance device (safety lock), and prepare to shut down the energy in advance

Step 2: The work of notification

Announce the work done by operators and managers who are likely to be affected by safety protection and maintenance equipment.

Step 3: The work of turning off

Turn off mechanical equipment or equipment

Step 4: Locking work

Use appropriate safety factors to lock the device and lock all electrical energy to turn off mechanical equipment or equipment. When locking, make sure that no one can turn on the main power switch or shut-off valve. Then put a warning sign on the safety factor lock to prevent accidental operation.

Step 5: Inspection work

Check all equipment control devices and circuits to ensure that the mechanical energy is fully protected.

Step 6: Maintenance work

Carry out maintenance according to different equipment usage conditions, if some must be maintained once a month, some are longer…

Step 7: Return to normal operation

When all work is carried out and the scaffold tagging device is removed, please make it clear that all common tools and industrial equipment circuit locking devices have been removed. Please notify all employees as much as possible before showing the mechanical energy again.

Product Parameter

Material PVC
Type waterproof
Warranty 1 Year
Product Name durable scaffolding  tag,KT-01

z (1)
z (2)
z (3)
z (4)
z (5)
z (6)


Product detail pictures:


Related Product Guide:

Our company sticks into the basic principle of "Quality is definitely the life of the business, and status may be the soul of it" for 100% Original Factory Custom Tags - Plastic Safety Scaffolding Holder tag KT-01 – Boyue , The product will supply to all over the world, such as: Iran, Ottawa, Uruguay, Customer satisfaction is our first goal. Our mission is to pursue the superlative quality, making continual progress. We sincerely welcome you to make progress hand in hand with us, and construct a prosperous future together.
The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
5 Stars By Vanessa from Italy - 2018.11.28 16:25
It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
5 Stars By Carey from Canada - 2018.10.01 14:14

Send your message to us:

Write your message here and send it to us

Send your message to us:

Write your message here and send it to us

Get the data sheet or free quote

Write your message here and send it to us